Directional drilling
HDD-controlled drilling
We carry out professional HDD (Horizontal Directional Drilling) projects for the energy, infrastructure and industrial sectors. We undertake both MINI/MIDI HDD projects and advanced MAXI HDD projects for the largest energy infrastructure projects in Poland and Europe.
Thanks to our own equipment, experienced teams and state-of-the-art technologies, we carry out projects in challenging geological and terrain conditions.
MAXI HDD
We carry out directional drilling for:
- motorways and expressways,
- main railway lines,
- major rivers and reservoirs,
- industrial sites and strategic energy infrastructure,
- areas with complex geological conditions,
- coastal areas in offshore projects (landfall).
Application:
- HV and LV cable lines,
- multi-pipe power systems,
- infrastructure for offshore wind farms,
- long-distance energy and industrial connections,
- strategic infrastructure projects
- boreholes exceeding 1,000 metres in length.
Machinery:
- Prime Drilling PD 100
- Prime Drilling PD 250
- Herrenknecht HK 250T
- Prime Drilling PD 45 – 2 units (as part of the fleet expansion)
- Herrenknecht HK 300 – 2 units (as part of the fleet expansion)
MACHINERY FLEET - MAXI HDD
Herrenknecht HK 250T
- Tensile force: 2500 kN
- Torque: 120 kNm
- Thrust: 1000 kN
- Length of the drill pipe: 9.5 m
- Drill pipe diameter: 6 5/8”
Prime Drilling PD 250
- Tensile force: 2500 kN
- Torque: 90 kNm
- Thrust: 1000 kN
- Length of the drill pipe: 9.5 m
- Drill pipe diameter: 6 5/8”
Prime Drilling 100
- Tensile force: 1000 kN
- Torque: 65 kNm
- Thrust: 1000 kN
- Length of the drill pipe: 9.5 m
- Drill pipe diameter: 6 5/8”
MINI/MIDI HDD
We carry out directional drilling for:
- local and regional roads,
- rail and tram lines,
- pavements, car parks and squares,
- rivers and watercourses,
- urban areas with a high density of underground infrastructure,
- existing energy and telecommunications networks.
Zastosowanie:
- LV and MV power cables,
- fibre-optic cables and telecommunications networks,
- water supply and sewerage pipelines,
- industrial and infrastructure connections.
Machinery:
- DitchWitch JT100 M1
- DitchWitch JT4020 M1
- DitchWitch JT3020 M1 - 2 units
- DitchWitch JT2020 M1
- DitchWitch JT922 M1
- Recykler RU500
- Recykler RU300 – 2 units
SELECTED PROJECTS


Drilling works – IPA A-Nord project
Investor: Amprion
(2025-2026)
- 12 HDD boreholes, each over 1,000 metres long
- Total length of drilling: 12 km
- Drilling depth: 18–20 m
- Navigation technology: Gyro / ParaTrack II
- 2 x 250-tonne-class drilling rigs – operating in parallel
- A flushing system with a capacity of 6,500 l/min


Drilling operations – SuedLink PFA 3
Investor: TENNET / ARGE
- 18 boreholes, each 745–930 m long,
- Total length of boreholes: 14.55 km,
- Depth of boreholes: 14–23 m.
- Navigation technology: ParaTrack 2,
- 1 drilling rig with a pulling force of 250 t,
- A flushing system with a capacity of 2,500 l/min.


Drilling operations – SuedLink Lot 8
Investor: TRANSNET BW / STRABAG
- 3 boreholes drilled using the HDD method, each over 870 m long,
- Total length of boreholes: 2.6 km,
- Ground conditions: rock borings,
- Navigation technology: ParaTrack 2,
- 1 drilling rig with a pulling force of 250 t,
- A flushing system with a capacity of 2,500 l/min.
Completed projects
Main business partners
WHY ELEKTROPAKS?
- Our own modern HDD machinery fleet
- Experience in energy projects
- Gyro and ParaTrackII navigation technologies
- Projects carried out in challenging geological conditions
- A team of experienced engineers and operators
As well as carrying out contracts for the company, we provide comprehensive directional drilling services to external clients.
For further information, please call 883 331 508 or email: przewierty@elektropaks.pl







































ELEKTROPAKS company implemented a project under Priority Axis 4 Environmentally Friendly Energy, Action 4.2 Energy Production from RES in Enterprises, Regional Operational Programme of Lubelskie Voivodeship for 2014-2020