Here are sample projects in the field of construction and modernization of high-voltage and medium-voltage lines, as well as power substations:

TMFW BAŁTYK II Offshore Wind Energy Project, electrical installation and onshore substation EPC project
Investor:
Polenergia S.A. Equinor Wind Power AS
Construction of the 110/15kV power substation GPZ Rozwadów
Investor:
PGE Dystrybucja S.A
Reconstruction and expansion of the Trzy Korony hotel and restaurant facility in Puławy.
Investor:
Elektropaks Sp. z o.o.

Construction of a 110 kV cable line between Łomianki and Czosnów.

Investor:

PGE Dystrybucja S.A.

Construction of a double-circuit 110 kV cable line between RPZ Gdańska and EC Żerań on the section between proposed cable poles No. 15 and 23, and between RPZ Wschodnia and EC Żerań on the section between proposed cable poles No. 29 and 37.

Investor:

Stoen S.A

Construction of the 110/15 kV RPZ Tarchomin substation

Investor:

PGE Dystrybucja S.A.

Construction of the 110/15 kV GPZ Czosnów substation.

Investor:

PGE Dystrybucja S.A.

Construction of the 110/30 kV SGS-6 Osiny substation.

Investor:
PGE Górnictwo Energetyka Konwencjonalna S.A.

Expansion of the 110/15 kV Staroniwa substation in Rzeszów.

Investor:

PGE Dystrybucja S.A.

Expansion of the 110/15 kV Centralna substation in Rzeszów.

Investor:

PGE Dystrybucja S.A.

Design and reconstruction of the 110/15/10 kV Lublin Dziesiąta substation.

Investor:

PGE Dystrybucja S.A.

Design and construction of the 110/15 kV Bursaki substation.

Investor:

PGE Dystrybucja S.A.

Modernization and reconstruction of the 110/15 kV Gorzyce substation.

Investor:

PGE Dystrybucja S.A.

Construction of the 110/15/6 kV RPZ Polesie substation, including connections on the HV and MV sides.

Investor:

PGE Dystrybucja S.A.

Expansion of the 15/15 kV RSM Cybernetyki power substation to a 110/15 kV station – stages I and II.

Investor:

PGE Dystrybucja S.A.

Cabling of the 110 kV Kawęczyn–Miłosna line.

Investor:

PGE Dystrybucja S.A.

Reconstruction and expansion of the GPZ KZWM substation in Kielce.

Investor:

PGE Dystrybucja S.A.

Construction of the 110/15 kV Banie Mazurskie substation.

Investor:

PGE Dystrybucja S.A.

Construction of the 110/15 kV RPZ Ursus Miasto substation.

Investor:

PGE Dystrybucja S.A.

Construction of the 110 kV cable line, DTS system, and fiber-optic line along the R-106 Żelazna – R-134 Skarbowców route in Wrocław.

Investor:

PGE Dystrybucja S.A.

Construction of the 110/6 kV “Bzie” power substation and the 6 kV main switchgear “Bzie” at the “Borynia-Zofiówka” Coal Mine, Zofiówka Division.

Investor:

PGE Dystrybucja S.A.

Modernization of the 110 kV switchgear in the 110/6 kV Podlesie substation.

Investor:

PGE Dystrybucja S.A.

Installation of the new GPZ-3 substation at the Płock power plant facility.

 

Investor:
Inwestor Orlen S.A.

Reconstruction of the 110/20/10 kV R-105 Wrocław Swojec substation.

Investor:
Tauron Dystrybucja S.A.

Construction of the 110/15 kV Euro-Park 1 power substation in Stalowa Wola.

Investor:

PGE Dystrybucja S.A.

Reconstruction of the 110/15 kV GPZ Końskie Stary Młyn substation.

Investor:
PGE Dystrybucja S.A.

Replacement of the 6 kV cables from GPR-P4 and GPR-P3.

Investor:
Inwestor Orlen S.A.
elektropaks-25821
elektropaks-25820
elektropaks-25819
elektropaks-25818
elektropaks-25817
elektropaks-25816
elektropaks-25815
elektropaks-25814
elektropaks-25813
elektropaks-25812
elektropaks-25811
elektropaks-25810
elektropaks-2589
elektropaks-2588
elektropaks-2587
elektropaks-2586
elektropaks-2585
elektropaks-2584
elektropaks-2583
elektropaks13
elektropaks15
elektropaks16
elektropaks18
elektropaks32
elektropaks31
elektropaks30
elektropaks29
elektropaks28
elektropaks26
elektropaks37
elektropaks38
elektropaks40
elektropaks41
elektropaks43
5N8A7321-e17250385597112
013
DSCN3630
DSCN3563
IMG_0261
116
IMG_0356
IMG_1933
IMG_2039
IMG_2040
IMG_2043
IMG_20190410_094414
IMG_20190410_100009
IMG_20190410_100618
IMG_20190410_100733
IMG_20190410_100718
130
134
IMG_2080
IMG_20180530_131352
IMG_20180530_114815
IMG_20180530_114755
IMG_20180314_160736
ELEKTROPAKS Sp. z o.o. carried out a project under Priority Axis 4: Environmentally friendly energy, Measure 4.2: Production of energy from renewable sources in enterprises, as part of the Regional Operational Programme of the Lublin Voivodeship 2014–2020.